PICTURE 1A
TAKEN MAY 5, 2020
EXCAVATION SECTION 1 ONLY TAKEN AFTER THE COMMOTION ON THE LEAK SHOWING UP ON THE HOT WATER LINE, THEN THEY STOPPED DIGGING SECTION 1 AND CONTINUED DIGGING AWAY FROM SECTION 1 TO SECTION 2 SHOWING DELIBERATE INTENT NOT TO FIX THE LEAK BUT TO JUST TO MAKE AN EXCAVATION USEFUL TO HIS INTENT TO FALSELY STATE THAT HE HAD EXCAVATED A LOT AND THAT HE WAS NOT ABLE TO SEE ANY LEAK AND THAT THE LEAK SHOULD BE FROM UNDER THE FOUNDATION HE STRESSED, FOR THE BENEFIT OF STATE FARM INSURANCE.
|

No comments:
Post a Comment